MEPCO New Connection

To gain a MEPCO new connection, you could observe the method outlined below. This includes steps for both online and offline applications, anticipated timeframes, and vital details about record requirements and monitoring your application status.

How to Apply for a MEPCO New Connection

Application Methods

  • Offline Application:
  1. Visit MEPCO Office: Go to your nearest MEPCO customer service center For MEPCO New Connection and obtain the application form.
  2. Fill Out the Form: Provide your details, including CNIC, address, and type of connection required.
  3. Submit Documents: Attach all required documents and submit the completed form at the office
  • Online Application:
  • Step = 1

Enter Electricity New Connection in google. Go to the Electricity New Connection (ENC) website.

  • Step = 2

 Now, click the “Apply” button on the left side of the page .That mention in image.

  • Step= 3

Now, enter your neighbor’s reference number Or  Old reference number . That Mention in image

  • Step= 4

Then select the category type of Connection you want to apply for and click that you choose category.

  • Step = 5

Submit Form: After filling out the form and uploading documents, submit it online.

  • Step = 6

Print Application: Download and print the application form using the provided tracking ID.

  • Step = 7

Submit Hard Copies: Send the printed form and attached documents to the nearest MEPCO office.

Required Documents

  • Proof of Ownership or Rent Agreement: For residential connections, or a No Objection Certificate (NOC) if you are a tenant.
  • Undertaking by the Applicant: A statement regarding the connection. Power of Attorney: If the property has multiple owners.
  • Copy of CNIC: For the CNIC OF applicant .
  • Copies of Witnesses: Two witnesses’ CNIC copies (not required for single-phase connections).
  • Tariff Copy: Duly signed by the customer.

Estimated time for new connection:

  1. For Category 1 (Up to 15 kW):
    • Submit Application: Receive a receipt and seniority number.
    • Site Inspection: An officer will visit to assess feasibility.
    • Cost Estimate: Office provides an estimate.
    • Demand Notice: Issued after cost estimation.
    • Payment: Deposit payment and submit proof to MEPCO.
    • Wiring Test Report: Submit for verification.
    • Priority List: Created based on dues submission date.
    • Service Connection Order: Issued.
    • Obtain Connection Items: From the store.
    • Installation: Completed by SDO or Assistant Manager.
    • Approximately 30 days.
  2. For Category 2 (16 to 70 kW):
    • Process: Similar to Category 1 but may take up to 44 days.
  3. For Category 3 (71 to 500 kW):
    • Similar to Categories 1 and 2 but may take up to 73 days.

Tracking Your Application

Online Portal: Use the tracking ID provided after submitting your application to check the status on the ENC website.

Helpline: Call the MEPCO helpline at 1118 for status inquiries.

Demand Notice and Payment

  • Receive Demand Notice: After site inspection, MEPCO will issue a demand notice with details on charges. Payment: Pay at authorized banks and submit proof of payment to MEPCO.
  • Verification: After payment verification, the meter connection will be installed.

Installation and Metering

  • Installation: A MEPCO technician will install the meter and complete the setup.
  • Meter Types: Includes single-phase and three-phase meters, with a one-year warranty.
  • Meter Reading: MEPCO will take monthly readings, or you may report them yourself.

Billing and Payments

  • Monthly Bills: Generated based on consumption, with payment options including cash, online banking, and mobile apps.
  • Timely Payment: Avoid late fees by paying bills promptly.

Complaint Redressal

  • Register Complaints: Via phone, in-person, or online if you face issues with application processing, billing, or service.
  • Documentation: Keep records of your application and communication for reference.

By following these steps, you can effectively navigate the process of acquiring a MEPCO new connection and ensure a smooth transition to receiving power services.

For More Information Please Visit Our Website: https://onlinebillmepco.pk/